RAS Engineers and Building Testing Lab

Building Performance, Preservation and Durable Restoration (800) 508-2824

Home

About Us

Projects

Publications

Career

Our Mission

Contac Us

Consulting

Particulates Test, Carbon

Interior Mold and Radon

Air leakage test

Wall Sound Transmission T

Interior Floor-Ceiling So

Interior Illumination Sur

High-Strength Bolts Insta

Slab Load Testing

Railings Load Testing

Tiles Pull-out Testing

Adhesion Testing on metal

Windows and Facades Air L

Interior Flood Testing

Deluge Testing

Water Absorption Testing

Epoxy-Injected Depth Test

Echo Sound Testing

Post-Tensioning Strand Ma

Voids Testing

Moisture Testing

Concrete Slump, Temperatu

Dry Concrete Strength Tes

Chlorides Content Testing

Carbonation Testing

Alkali Silica Reaction Te

Floor Skid Testing

Fresh Grout Slump Testing

Foundation Ground Penetra

Reinforcing Mapping

Pull-out Testing

Expansion joints Movement

Expansion Joints Flood Te

Expansion Joints Adhesion

Sealants Hardness and Hum

Sealant Adhesion Testing

Painting Layers Thickness

Fresh Painting Test

Dry Painting Test

Facades Water Deluge Test

Planter Box, Protective B

Deck Flood Testing

Woodblock and Metal Flash

Metal and Coping Caps Wit

Roof Tile Uplift Testing

Wet Foam Adhesion, and Te

Roof Fastener Uplift Test

Insulation Moisture Conte

Membrane Uplift Testing

Infrared and Impedance

Turn-Over Inspection

Building Inspection

Code Compliance

Facades Inspection

40-Yr Safety Inspection

5-Yr Reserve Report

Railing Safeguard Inspect

Insurance Damage

Maintenance Planning

OSHA Tie-Backs Testing

CondoReserveConvertert

Turnover

Re-Commissionig

Building Testing

Asphalt

Concrete

Dampproofing

Epoxy

Expansion Joints

Fasteners

Flooring

Masonry

Painting

Roofing

Sealants

Steel

Stucco

Waterproofing

Building Exteriors

Facades

Structure

Roof

Balconies

Windows

Cooling Tower

Building Interiors

Air Conditioning

Basement

Electrical

Plumbing

Elevators

Lightning

Fire Protection

Life and Safety

Floors

Interior Walls

GREEN Buildings

Indoor Air Quality

Airborne Sound

Air Testing and Balancing

Energy

Environmental

Leaks Detection

LEED Commissioning

 
 
Pre-Construction
Consulting Engineer
Cooling Tower Enclosure Water Penetration
Cooling Tower Enclosure Concrete Water and Air Permeability Testing
Cooling Tower Enclosure Concrete Chlorides Content Testing
Cooling Towers

Construction Phase
Testing
Concrete beam support corrosion testing
Cooling tower feedwater pipes thickness testing
Painting adherence on cooling tower steel beam pull-out testing
Cooling tower enclosure corrosion rate testing
Cooling tower enclosure concrete corrosion testing
Corrosion Testing on Pipes
Cooling tower enclosure concrete moisture testing
 
Post-Construction
Consulting Engineer
HOME   ORDER   ONLINE   REQUEST INSPECTION   REQUEST PROPOSAL