| |
Due Diligence Inspection |
| |
Building Condition Assessment |
| |
Structural Assessment Inspection |
| |
Roofing Condition Assessment |
| |
HVAC Inspection |
| |
Plumbing Inspection |
| |
Project Budget Cost Estimating |
| |
On-Site Project Representation |
| |
Record As-Built Drawings |
|
| |
Structural design
|
| |
Buildings MEP Design |
| |
Marina-Dock Structural Design |
| |
Feasibility, Change of Occupancy |
| |
Design and Construction Scheduling |
| |
Value Engineering |
| |
Life Cycle Costing |
| |
Specifications for Testing and QC |
|
|
| |
Bid and Specifications Review |
| |
Bid Tabulation |
|
| |
Roof Replacement
In-Progress Inspection |
| |
Bank Draw and Progress inspection |
| |
Metal Fabrications Shop Drawings Design |
| |
Schedule Development and Monitoring |
| |
Review of shop drawings for Pre-Engineered Structural Elements |
| |
Special Inspection required by Code |
| |
Walk-Thru, Punch List, and Close out |
| |
Post-Contract Evaluation |
| |
Claims and Dispute Resolution |
| |
Cost Control |
| |
Expert Witness Testimony |
|
|
| |
Turn-over inspection |
| |
Reserve Study |
| |
Condo Conversion Engineer’s Report |
| |
Maintenance Planning |
| |
Fixed Assets Inventory |
| |
Assessment of concrete in service |
| |
Roof Consulting and Specifications |
| |
Roof Annual Assessment |
| |
Glazing Structural Inspection |
| |
Envelope Waterproofing Assessment |
| |
40-Year Recertification |
| |
Balcony Railings DBPR Inspection |
| |
Insurance Damage Assessment |
| |
HVAC Inspection |
| |
Cooling Towers replacement spec |
| |
Fire Sprinklers inspection |
| |
NFPA Life and Safety inspection |
| |
Windows replacement spec |
| |
Elevators inspection |
| |
Emergency Power Generator Specs |
|
|