FEASIBILITY REPORT to add or replace a Power Generator
|
The Engineer's report will state the feasibility of adding an automatic electrical generation system to provide power for the building life safety components. Usually the minimum requirements by code are related to lighting on egress corridors and stairs, fire pump, elevators, fire alarm panel, access control system, and smoke control system, if applicable. However, the emergency power can serve additional purposes if required by the owner.
|
|