20 Questions to Plan Repairs After a Milestone Inspection

An inspection finding is the beginning of a repair decision, not a complete construction scope. Use these questions in a board or management meeting to organize the next discussion with the engineer. Record the answer, responsible person, and follow-up for each item.

Understand the report

  1. Which conditions need prompt attention? Ask the report author to explain the stated priorities.

  2. Where are the affected areas? Request location references that match the report photographs.

  3. What remains uncertain? Identify concealed areas and the limits of the evaluation.

  4. Is further investigation recommended? Clarify the question each proposed test will answer.

Define the repair-engineering scope

  1. Are repair drawings required? Establish the design deliverables before seeking comparable bids.

  2. Which materials and assemblies are involved? Separate structural repairs from finishes and waterproofing.

  3. What adjacent work is necessary? Consider access, protection, opening, and restoration.

  4. Who will coordinate permitting? Assign responsibility for the required documents and submissions.

Compare contractor proposals

  1. Are bidders pricing the same documents? Issue one controlled scope.

  2. Are quantities measured or allowances? Ask how changes will be documented.

  3. What exclusions differ? Review access, protection, testing, and finish restoration.

  4. How will concealed conditions be handled? Establish the engineering review and approval process.

Coordinate construction

  1. Who is the management contact? Keep scheduling and resident communication consistent.

  2. Which stages require observation? Arrange visits before work is covered.

  3. Who answers technical questions? Follow the project’s document-control process.

  4. How are changes approved? Keep written scope and cost records.

Close the project with a usable record

  1. Which items remain open? Track follow-up to resolution.

  2. What testing and observation records are needed? Collect them throughout the work.

  3. What must be submitted to the authority? Confirm the property-specific requirements.

  4. What should be retained for future maintenance? Assemble drawings, reports, permits, and warranty information.

Discuss your property with RAS

Request a complimentary site visit. We’ll discuss your needs and then provide a project-specific proposal defining the engineering scope.

Request a complimentary site visit · (888) 343-0713 · ras@rascompany.com

Related: Milestone repair FAQs · Repair engineering documents